ค้นเจอ 93 รายการ

Acid-Process

แปลว่า(english) A process of making steel, either Bessemer, open-hearth or electric, in which the furnace is lined with a siliceous refractory and for which low phosphorus pig iron is required as this element is not removed.

Base Metal

แปลว่า(english) (1) The metal present in the largest proportion in an alloy; (2) the metal to be brazed, cut or welded; (3) after welding the part of the metal that was not melted during the process.

Peeling

แปลว่า(Concrete Engineering) A process in which thin flakes of matrix or mortar are broken away from concrete surface; caused by adherence of surface mortar-to forms as forms are removed, or to trowel or float in portland cement plaster.

basic element

แปลว่าองค์ประกอบพื้นฐาน

N

Bridling

แปลว่า(english) The cold working of dead soft annealed strip metal immediately prior to a forming, bending, or drawing operation. A process designed to prevent the formulation of Luder's lines. Caution-Bridled metal should be used promptly and not permitted to (of itself) return to its pre-bridled condition.

Blasting (Blast Cleaning)

แปลว่า(english) A process for cleaning or finishing metal objects by use of an air blast or centrifugal wheel that throws abrasive particles against the surface of the work pieces. Small, irregular particles of steel or iron are used as the abrasive in grit blasting, and steel or iron balls in shot blasting.

Blast Furnace

แปลว่า(english) 1) A furnace in which solid fuel (limestone, coke, iron ore) is combined with high-pressure, hot air blast (120,000 psi) to smelt ore in a continuous process (They are never stopped. They can be slowed down or idled). A Blast Furnace in the iron and steel industry is used to produce liquid iron.

Brown Sharp Gages

แปลว่า(english) A standard series of sizes refered to by numbers, in which the diameter of wire or thickness of sheet metal is generally produced and which is used in the manufacture of brass, bronze, copper, copper-base alloys and aluminum. These gage numbers have a definite relationship to each other. In this system, the decimal thickness is reduced by 50% every six gage numbers- while temper is expressed by the number of B&S gage numbers as cold reduced in thickness from previous annealing. For each B&S gage number in thickness reduction, where is assigned a hardness value of 1/4 hard.

Basic Oxygen Furnace (BOF)

แปลว่า(english) "WHAT A pear-shaped furnace, lined with refractory bricks, that refines molten iron from the blast furnace and scrap into steel. Up to 30% of the charge into the BOF can be scrap, with hot metal accounting for the rest. WHY BOFs, which can refine a heat (batch) of steel in less than 45 minutes, replaced open-hearth furnaces in the 1950s; the latter required five to six hours to process the metal. The BOF's rapid operation, lower cost and ease of control give it a distinct advantage over previous methods. HOW Scrap is dumped into the furnace vessel, followed by the hot metal from the blast furnace. A lance is lowered from above, through which blows a high-pressure stream of oxygen to cause chemical reactions that separate impurities as fumes or slag. Once refined, the liquid steel and slag are poured into separate containers. "